Subsequently, under the leadership of the Honourable Allan J. MacEachen, two tunnels were drilled at a cost of a little over $80 million between 1980 and 1984-85.
Ensuite, sous la direction de l'honorable Allan J. MacEachen, deux tunnels ont été forés, pour un peu plus de 80 millions de dollars, entre 1980 et 1984-1985.