Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Agitational terror
BTL technique
Below stage
Below the hook lifter
Below the line technique
Below-hook lifter
Below-stage
Below-the-hook lifting device
Below-the-line method
Below-the-line technique
Bounded below
Bounded from below
Calls below indicator
Calls below signal
Cellar
Hoisting accessory
Insurgent terrorism
Invisible object floating below the water surface
Lifting accessory
Perform freight loading preparation
Prepare loading activity resources
Prepare resources for loading activities
Ready loading activity resources
Revolutionary terror
Revolutionary terrorism
Terror from below
Terrorism from below
Trap room
Unknown object floating below the water surface

Vertaling van "load and below " (Engels → Frans) :

TERMINOLOGIE
below the line technique | below-the-line method | below-the-line technique | BTL technique

technique hors média | below the line | technique hors médias


hoisting accessory | lifting accessory | below the hook lifter | below-hook lifter | below-the-hook lifting device

accessoire d'appareil de levage | accessoire de levage


agitational terror | insurgent terrorism | revolutionary terror | revolutionary terrorism | terror from below | terrorism from below

terrorisme d'en bas | terrorisme révolutionnaire


invisible object floating below the water surface | unknown object floating below the water surface

objet inconnu flottant entre deux eaux en immersion | objet invisible flottant entre deux eaux en immersion


calls below indicator | calls below signal

indicateur d'appels en bas | indicateur d'appels en-dessous | signal d'appels en bas | signal d'appels en-dessous


A rare congenital anomaly of the great veins with characteristics of an anomalous course of the left brachiocephalic vein, passing from left to right below the aortic arch and entering the superior vena cava below the orifice of the azygos vein. Pati

veine innominée sous-aortique


bounded from below | bounded below

minoré | borné inférieurement




perform freight loading preparation | ready loading activity resources | prepare loading activity resources | prepare resources for loading activities

préparer des ressources pour les activités de chargement


organise loads according to capacity of lifting equipment | organise weight of loads according to lifting device capacity | organise weight of loads according to capacity of lifting equipment | organise weight of loads according to lifting equipment capacity

organiser le poids de charges en fonction de la capacité d’équipements de levage
IN-CONTEXT TRANSLATIONS
(c) where in the case of any ship the subdivision load line marks assigned are located below the lowest of the ordinary load lines, the latter load lines, if the owner so desires, need not be placed on the ship’s sides; for such cases the ship’s sides shall be marked with the deck line, the disc, the horizontal line through the centre of the disc, the subdivision load line or lines and the fresh water load line; the fresh water load line mark shall be placed at the same distance above the disc as if the disc were in its normal posit ...[+++]

c) dans le cas de tout navire, on pourra omettre de marquer sur la muraille du navire les lignes de charge ordinaires les plus basses, si le propriétaire le désire, lorsque les marques de lignes de charge de compartimentage assignées seront situées au-dessous; dans ce cas, le livet de pont, le disque, la ligne horizontale passant par le centre du disque, la ou les lignes de charge de compartimentage et la ligne de charge en eau douce seront marqués sur la muraille; la marque de la ligne de charge en eau douce sera placée à la même distance au-dessus du disque que si le disque était à sa position normale; la ligne de charge en eau douce sera désignée par l ...[+++]


36 (1) Valves on loading or unloading pipe terminals located below ground level and within 20 feet of a track shall be enclosed by suitable valve boxes the tops of which shall not extend above ground level and shall be located not less than six feet from the gauge side of the nearest rail of the loading or unloading track.

36 (1) Les soupapes des postes de chargement ou de déchargement de canalisation situées au-dessous du niveau du sol et à moins de 20 pieds d’une voie ferrée seront renfermées dans des boîtes à soupape convenables. Le dessus de ces boîtes ne dépassera pas le niveau du sol et se trouvera à au moins six pieds de la face intérieure du plus proche rail de la voie de chargement ou de déchargement.


36 (1) Valves on loading or unloading pipe terminals located below ground level and within 20 feet of a track shall be enclosed by suitable valve boxes the tops of which shall not extend above ground level and shall be located not less than six feet from the gauge side of the nearest rail of the loading or unloading track.

36 (1) Les soupapes des postes de chargement ou de déchargement de canalisation situées au-dessous du niveau du sol et à moins de 20 pieds d’une voie ferrée seront renfermées dans des boîtes à soupape convenables. Le dessus de ces boîtes ne dépassera pas le niveau du sol et se trouvera à au moins six pieds de la face intérieure du plus proche rail de la voie de chargement ou de déchargement.


‘bivalent temperature’ (Tbiv) means the outdoor temperature (Tj) [°C] declared by the manufacturer for heating at which the declared capacity equals the part load and below which the declared capacity must be supplemented with electric back up heater capacity in order to meet the part load for heating;

«température bivalente» (Tbiv), la température extérieure (Tj) (en °C) déclarée par le fabricant pour le chauffage à laquelle la puissance déclarée est égale à la charge partielle et en dessous de laquelle la puissance déclarée doit être complétée par la puissance d'un dispositif de chauffage électrique de secours afin de répondre à la charge partielle de chauffage;


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Mr. Mackay: Load factors are what they were prior to September 11 when we were running loads in the low 70s, and sometimes even higher than that. We are now seeing loads below the 70-percentile mark.

M. Mackay: Les coefficients de remplissage sont ce qu'ils étaient avant le 11 septembre: à ce moment-là, c'était un peu plus de 70 et, parfois, c'était même plus élevé.


6.7.4.3.1. On two straps conditioned as prescribed in one of the provisions of paragraph 7.2.5.2. below (except para. 7.2.5.2.1. below), the breaking load of the strap shall be not less than 75 per cent of the average of the loads determined in the test referred to in paragraph 7.2.5.1. below.

6.7.4.3.1 Sur deux sangles conditionnées conformément à l’une des dispositions du paragraphe 7.2.5.2 ci-dessous (par. 7.2.5.2.1 excepté), la charge de rupture de la sangle ne doit pas être inférieure à 75 % de la valeur moyenne des charges mesurées lors de l’essai visé au paragraphe 7.2.5.1 ci-dessous.


the declared load profile shall be the maximum load profile or the load profile one below the maximum load profile;

le profil de soutirage déclaré est le profil de soutirage maximal ou le profil de soutirage situé un niveau en dessous du profil de soutirage maximal;


In the case of a dynamometer with an adjustable load curve, the accuracy of matching dynamometer load to road load must be 5 % at 100, 80, 60 and 40, and 10 % at 20 km/h. Below this, dynamometer absorption must be positive.

Dans le cas d'un banc à courbe d'absorption de puissance réglable, le réglage du banc doit pouvoir être adapté à la puissance absorbée sur route avec une précision de 5 % à 100, 80, 60, 40 km/h, et de 10 % à 20 km/h.


In the case of a dynamometer with adjustable load curve, the accuracy of matching dynamometer load to road load must be 5 % at 30, 40, and 50 km/h and 10 % at 20 km/h. Below this, dynamometer absorption must be positive.

Dans le cas d'un banc à courbe, d'absorption de puissance réglable, le réglage du banc doit pouvoir être adapté à la puissance absorbée sur route avec une précision de 5 % à 30,40 et 50 km/h, et de 10 % à 20 km/h.


With regard to Bow River water quality below Lake Louise, Alberta: (a) what are the potential cumulative impacts that development, community development and increased visitor use at Lake Louise may have on Bow River water quality; (b) what studies on the potential cumulative impacts are complete, and if not complete, why not; (c) what cumulative impact studies include considerations for communities downstream; (d) what is the maximum value for effluent loading of the Bow River at Lake Louise and below Lake Louise; (e) what are the ...[+++]

À propos de la qualité de l'eau de la rivière Bow, en aval du lac Louise, en Alberta: a) quels impacts cumulatifs les travaux d'aménagement, le développement communautaire et l'accroissement du nombre des visiteurs à Lake Louise peuvent-ils avoir sur la qualité de l'eau de la rivière Bow; b) quelles études sur les impacts cumulatifs potentiels sont complètes et, si elles ne le sont pas, pourquoi; c) quelles études sur les impacts cumulatifs incluent des considérations par les localités situées en aval; d) quelle est la quantité maximale d'effluents de la rivière Bow au lac Louise et en aval du lac Louise; e) quels sont les paramètres pour juger des considérations esthétiques de la qualité de l'eau de la rivière Bow en aval du lac Louise ...[+++]


w