Le coût total du programme est de 143 MECU (IRL 117m, UKL 120m) auquel les Fonds structurels contribueront pour 84 MECU (IRL 68,6m, UKL 71m).
The total cost of the programme is 143 MECU (IR#117m, UK#120m) to which the Structural Funds will contribute 84 MECU (IR#68.6m, UK#71m).