Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Accident caused directly by welding torch
Arc welding operations operation
Assistive welding table
Continuous lengths of rails
Continuous welded rail track
Execute metal active gas welding
Exposure to welding arc
Inert gas arc welding
Inert gas shielded arc welding
Long lengths of rails
Long welded rails
Making welds underwater
Operate metal inert gas welding
Perform MAG welding
Perform metal active gas welding
Perform metal inert gas welding
Ribbon rails
Shielded inert gas metal arc welding
Undertake non ferrous soldering and welding techniques
Underwater arc welding
Utilise metal inert gas welding
Weld materials underwater
Weld underwater
Welded track
Welding light

Traduction de «Welded track » (Anglais → Néerlandais) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
long welded rails | welded track

langgelast spoor | voegloos spoor


continuous lengths of rails | continuous welded rail track | long lengths of rails | long welded rails | ribbon rails

langgelaste spoorstaven


undertake non ferrous soldering and welding techniques | utilise metal inert gas welding | operate metal inert gas welding | perform metal inert gas welding

metaallassen met inerte gassen | MIG-lassen


arc welding operations operation | perform MAG welding | execute metal active gas welding | perform metal active gas welding

MAG-lassen | metaallassen met actieve gassen


making welds underwater | underwater arc welding | weld materials underwater | weld underwater

onder water lassen | onderwater lassen | onderwaterlassen


inert gas arc welding | inert gas shielded arc welding | shielded inert gas metal arc welding (sigma welding)

(boog) lassen in edelgas | vlambooglassen in edelgas








Accident caused directly by welding torch

ongeval rechtstreeks door lastoorts veroorzaakt
TRADUCTIONS EN CONTEXTE
In the rail sector funding was given to the Dublin-Belfast and Dublin-Cork lines (part of Essen Priority Project No 9) covering signalling improvement and replacement of old jointed tracks with continuous welded rail.

Binnen de spoorwegsector zijn middelen verstrekt voor de lijnen Dublin-Belfast en Dublin-Cork (onderdeel van het prioritaire Essen-project nr. 9), meer bepaald voor verbetering van de seinvoorzieningen en vervanging van oude rails met uitzetvoegen door continu aan elkaar gelaste rails.


The same applies to (i) the lengthening of the crane track in hall 3 and on quay 1, which will dispense with the need for [.] auto cranes, (ii) the acquisition of a hydraulic keel block system, as a result of which manual positioning of sections using auto cranes will no longer be necessary, and (iii) the purchase of automatic welding machines, which will reduce the time and costs associated with manual welding.

Hetzelfde geldt voor (1) de verlenging van het kraanspoor in loods 3 en op kade 1, waardoor de inzet van [.] autokranen overbodig wordt, (2) de aankoop van een hydraulisch kielbloksysteem, waardoor het niet meer nodig zal zijn de verschillende secties met behulp van autokranen in de juiste positie te brengen, en (3) de aankoop van automatische lasmachines, waardoor kan bespaard worden op de tijd en de kosten die verbonden waren met het manuele lassen.


Moreover, the Commission considers that the lengthening of the crane track on quay 1 and the investments in the upgrading of the welding machines are investments in existing installations.

De Commissie is voorts van mening dat de verlenging van het kraanspoor op kade 1 en de investeringen in moderne lasmachines ook investeringen in bestaande installaties vormen.


In the rail sector funding was given to the Dublin-Belfast and Dublin-Cork lines (part of Essen Priority Project No 9) covering signalling improvement and replacement of old jointed tracks with continuous welded rail.

Binnen de spoorwegsector zijn middelen verstrekt voor de lijnen Dublin-Belfast en Dublin-Cork (onderdeel van het prioritaire Essen-project nr. 9), meer bepaald voor verbetering van de seinvoorzieningen en vervanging van oude rails met uitzetvoegen door continu aan elkaar gelaste rails.


w