Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
100-year flood
Detention basin
Develop flood remediation strategies
Flood control
Flood control reservoir
Flood control structure
Flood control works
Flood crest
Flood damage mitigation
Flood defence
Flood defence structure
Flood detention basin
Flood mitigation
Flood mitigation reservoir
Flood mitigation works
Flood peak
Flood protection
Flood protection structure
Flood protection works
Flood remediation strategies developing
Flood remediation strategies writing
Flood retention basin
Flood storage reservoir
Flood summit
Flood-mitigation reservoir
Flood-mitigation works
Flood-retarding basin
Maximum intensity of flood
Micellar emulsion flooding
Micellar flooding
Micellar polymer flooding
Micellar s
Micellar-polymer flooding
Micellar-surfactant flooding
Microemulsion flooding
Momentary flood peak
Occurrence of 100-year flood
One hundred year flood
One-in-a-hundred year flood
One-in-one hundred year flood
Peak flood
Retarding basin
Surfactant flood
Surfactant flooding
Writing flood remediation strategies

Vertaling van "place in flood " (Engels → Frans) :

TERMINOLOGIE
micellar flooding [ micellar emulsion flooding | microemulsion flooding | micellar-surfactant flooding | surfactant flooding | surfactant flood | micellar/polymer flooding | micellar-polymer flooding | micellar polymer flooding | micellar/polymer flood | surfactant/polymer flooding | micellar s ]

injection de microémulsion suivie de polymères [ injection micellaire | injection de polymères micellaires | injection de solutions micellaires ]


flood control structure | flood control works | flood defence | flood defence structure | flood protection works | flood-mitigation works

ouvrage de protection contre les crues


flood crest | flood peak | flood summit | maximum intensity of flood | momentary flood peak | peak flood

niveau maximum d'une crue | pointe de crue


flood control reservoir | flood detention basin | flood retention basin | flood-mitigation reservoir | flood-retarding basin | retarding basin

bassin de laminage | bassin de rétention des crues | réservoir de maîtrise des crues | réservoir d'écrêtement des crues


flood protection structure | flood control structure | flood defence structure | flood protection works | flood control works | flood mitigation works

ouvrage de protection contre les crues


flood control reservoir | flood mitigation reservoir | flood storage reservoir | flood-retarding basin | retarding basin | flood retention basin | flood detention basin | detention basin

bassin de rétention des crues | réservoir d'écrêtement des crues | réservoir de maîtrise des crues | bassin de laminage


flood remediation strategies developing | writing flood remediation strategies | develop flood remediation strategies | flood remediation strategies writing

élaborer des stratégies de prévention et de remédiation des inondations


one-in-one hundred year flood [ one-in-a-hundred year flood | one hundred year flood | 100-year flood | occurrence of 100-year flood ]

crue centenaire [ crue centennale | crue à récurrence de 100 ans | inondation de cent ans ]


flood protection | flood control | flood mitigation | flood damage mitigation | flood defence

protection contre les crues | défense contre les crues | lutte contre les crues


flood crest [ peak flood | momentary flood peak | maximum intensity of flood ]

pointe de crue [ crête de crue ]
IN-CONTEXT TRANSLATIONS
Effective water management, as required by the WFD, helps Member States prepare for extreme weather events which, due to climate change, are becoming more frequent and cause tremendous damages.[3] To complement the WFD, the Floods Directive (FD) was adopted in 2007 and requires Member States to assess and map flood risks and hazards and to manage them by putting in place flood risk management plans (FRMPs).[4]

Une gestion efficace de l’eau, comme l’exige la DCE, aide les États membres à se préparer aux événements climatiques extrêmes, qui, en raison du changement climatique, deviennent de plus en plus fréquents et provoquent des dommages considérables[3]. Pour compléter la DCE, en 2007, la directive relative aux inondations (DI) a été adoptée, qui impose aux États membres d'évaluer et de cartographier les risques et dangers d’inondation et de les gérer en mettant en place des plans de gestion des risques d’inondation[4].


The "floods related" call for applications under simplified conditions took place between 2 December and 13 December 2002 for applicants in those NUTS II regions that were directly affected by floods - Prague, Central Bohemia, Northwest, Southwest and Southeast.

L'appel à candidature « Inondations et problèmes apparentés », organisé dans le cadre des conditions simplifiées, s'est tenu du 2 décembre au 13 décembre 2002 à l'intention des demandeurs des régions NUTS II directement affectées par les inondations : Prague, la Bohême centrale, le nord-ouest, le sud-ouest et le sud-est.


These plans establish objectives for the management of flood risks, focusing mainly on prevention (e.g. avoiding construction in areas that may flood), protection (measures to reduce the likelihood of floods in a specific place) and preparedness (informing the public about flood risks and what do to in the event of flooding).

Ces plans fixent des objectifs de gestion des risques d’inondations en se concentrant principalement sur la prévention (par exemple éviter de construire dans des zones sujettes aux inondations), la protection (des mesures visant à réduire la probabilité d’inondations dans un endroit spécifique) et la préparation (informer le public sur les risques d’inondations et ce qu’il convient de faire en cas d’inondations).


Over 90 per cent of the original oil remains in place and requires secondary or tertiary production. This will require optimized water flood, optimized polymer flood, CO flood, and other acronyms that I could go on and on about.

Plus de 90 p. 100 du pétrole original reste sur place et doit faire l'objet d'une production secondaire et tertiaire, des procédés qui exigeront un approvisionnement optimal en eau, en polymère, en CO et tutti quanti.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
We've talked about land use planning here and the importance of land use planning and flood management, but if you have a plan and you don't enforce it, if you have codes but you don't enforce them, if in places in Toronto now building is beginning to encroach again into the flood plain area or it's the same thing in Atlantic Canada, you invite a repeat of the disaster that befell you.

Nous avons parlé de la question de l'aménagement du territoire et de l'importance d'un tel aménagement et d'une gestion des crues, mais si l'on a un plan et qu'on ne l'exécute pas, si l'on a des normes de sécurité de construction mais qu'on ne les respecte pas, s'il y a des endroits comme Toronto où l'on construit présentement dans des secteurs qui commencent à dépasser le périmètre d'inondation, ou si l'on fait la même chose dans la région Atlantique, on s'expose à une répétition de la catastrophe qui a déjà frappé.


This being said, I must also raise that for the Red River flood and the Saguenay flood, those cases have been reviewed and a negotiation has taken place between the provinces—Manitoba on one side and Quebec on the other—and in that moment we have provided a special arrangement in addition to the disaster financial arrangements.

Cela étant dit, il faut remarquer que, dans le cas des inondations de la rivière Rouge et du Saguenay, les dossiers ont été examinés, et une négociation a eu lieu entre les provinces—le Manitoba, d'une part, et le Québec, d'autre part—et le gouvernement fédéral. Nous avons alors pris un arrangement spécial qui s'ajoutait à ce que prévoient les accords d'aide financière en cas de catastrophe.


The hon. member refers to flooding taking place, and as we speak, officials from my department, of the government in question at the provincial level, and first nations are working together to deal with the flooding situation.

La députée parle des inondations. En ce moment même, des représentants de mon ministère, du gouvernement de la province et des Premières Nations travaillent de concert pour faire face aux inondations.


These plans establish objectives for the management of flood risks, focusing mainly on prevention (e.g. avoiding construction in areas that may flood), protection (measures to reduce the likelihood of floods in a specific place) and preparedness (informing the public about flood risks and what do to in the event of flooding).

Ces plans fixent des objectifs de gestion des risques d’inondations en se concentrant principalement sur la prévention (par exemple éviter de construire dans des zones sujettes aux inondations), la protection (des mesures visant à réduire la probabilité d’inondations dans un endroit spécifique) et la préparation (informer le public sur les risques d’inondations et ce qu’il convient de faire en cas d’inondations).


flood hazard maps and flood risk maps as prepared under Chapter III, or already in place in accordance with Article 13, and the conclusions that can be drawn from those maps.

les cartes des zones inondables et les cartes des risques d’inondation préparées conformément au chapitre III, ou celles qui existent déjà conformément à l’article 13, et les conclusions qui peuvent en être tirées.


Events like this, events such as the Saguenay flood, events that took place in the Peace River, the floods in Manitoba and this tragic ice storm that affected much of Ontario, Quebec and New Brunswick, those are the things that show what Canadians do when there is a challenge.

Des événements comme ceux-ci, que ce soit les inondations au Saguenay, les incidents survenus à Peace River, les inondations au Manitoba et maintenant cette tragique tempête de verglas qui a touché une grande partie de l'Ontario, du Québec et du Nouveau-Brunswick, voilà des situations qui permettent aux Canadiens de démontrer ce qu'ils sont capables de faire lorsqu'ils sont mis au défi.




datacenter (1): www.wordscope.be (v4.0.br)

'place in flood' ->

Date index: 2022-10-09
w