Key follow-up actions: Pursue the implementation of the key infrastructure projects defined in the Commission Communication on 'Energy infrastructure priorities for 2020 and beyond' Diversify gas and oil supply sources and routes including by opening the Southern Corridor as a matter of urgency Promote viability and continuous functioning of the existing oil and gas infrastructure in the East and support the rehabilitation of the Ukrainian gas transmission network by 2020 Develop a tri-partite cooperation at political and administrative level with Russia and Ukraine to ensure stable and uninterrupted gas supplies through the Eastern Corridor Promote cooperation on renewable energy projects with the Southern Mediterranean countries, notably
...[+++]in the framework of the Mediterranean Solar Plan, with the launching of pilot solar plant projects in 2011-2012 |Principales mesures de suivi Poursuivre la réalisation des grands projets d'infrastructure définis dans la communication de la Commission sur les «Priorités en matière d'infrastructures énergétiques pour 2020 et au-delà». Diversifier les sources et les routes d'approvisionnement en gaz et en pétrole, notamment en ouvrant d'urgence le corridor sud-européen. Promouvoir la viabilité et le fonctionnement continu des infrastructures pétrolières et gazières existant à l'est et soutenir la modernisation du réseau ukrainien de transport de gaz d'ici à 2020. Développer une coopération tripartite, au niveau politique et administratif, avec la Russie et l'Ukraine afin de garantir un approvisionnement en gaz stable et ininterrompu par le corridor Est.
...[+++]Promouvoir la coopération avec les pays du sud de la Méditerranée sur des projets d'énergie renouvelable, notamment dans le cadre du plan solaire méditerranéen, en lançant des projet pilotes de centrales solaires en 2011-2012. |