Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assess fire risks
Assess transport risks
Conduct transportation risk assessments
Credit risk
Daily risk‑management process
Day-to-day risk management process
Default risk
Determine fire risks
Determining fire risks
ERM
Enterprise risk management
Exchange risk
Explosion hazard
Explosion risk
Financial risk
Fire danger
Fire hazard
Fire risk
Foreign exchange rate risk
Get involved in the day-to-day operations
Industrial hazard
Interest rate risk
Intra-day risk
Lay day lay day
Lay-day lay-day
Liquidity risk
Loading day
Loan risk
Macroprudential risk
Market risk
Measure fire risks
Number of patient days at risk
Risk analysis
Risk assessment
Risk management
Risk of explosion
Sovereign risk
Systematic risk
Systemic risk
Take part in the day-to-day operation of the company
Technological risk
Toxic hazard
Toxic risk

Vertaling van "day risk " (Engels → Frans) :

TERMINOLOGIE


daily risk‑management process | day-to-day risk management process

processus de gestion quotidienne des risques


getting involved in the day-to-day operation of the company | take part in the day-to-day operation of the company | get involved in the day-to-day operation of the company | get involved in the day-to-day operations

s’impliquer dans les activités quotidiennes de l’entreprise


financial risk [ credit risk | default risk | exchange risk | foreign exchange rate risk | interest rate risk | liquidity risk | loan risk | macroprudential risk | market risk | sovereign risk | systematic risk | systemic risk ]

risque financier [ risque de change | risque de crédit | risque de défaillance | risque de liquidité | risque de marché | risque de taux d'intérêt | risque macroprudentiel | risque souverain | risque systématique | risque systémique ]


lay day lay day | lay-day lay-day | loading day

jour de planche | starie


risk management [ enterprise risk management | ERM | risk analysis | risk assessment | risk assessment(UNBIS) ]

gestion du risque [ analyse du risque | évaluation du risque | gestion des risques | gestion du risque d’entreprise ]


industrial hazard [ explosion hazard | explosion risk | fire danger | fire hazard | fire risk | risk of explosion | technological risk | toxic hazard | toxic risk ]

risque industriel [ risque d'explosion | risque d'incendie | risque technologique | risque toxique ]


number of patient days at risk

nombre de jours-patients exposés à l'infection


analyse transportation risks through use of measurement equipment and tools | conduct transportation risk assessments | assess transport risks | use measurement equipment and tools to assess transportation risks

évaluer des risques de transport


assess fire risks | measure fire risks | determine fire risks | determining fire risks

évaluer les risques d’incendie
IN-CONTEXT TRANSLATIONS
17 October: International Day for the Eradication of Poverty - Downward trend in the share of persons at risk of poverty or social exclusion in the EU - But still over 115 million people in this situation // Brussels, 16 October 2017

17 octobre: journée internationale pour l'élimination de la pauvreté - Tendance à la baisse pour la proportion de personnes menacées de pauvreté ou d'exclusion sociale dans l'UE // Bruxelles, le 16 octobre 2017


20 November: Universal Children's Day- One in four children at risk of poverty or social exclusion in the EU- 25 million children in this situation in the EU // Brussels, 16 November 2016

20 novembre: Journée mondiale de l'enfance- Un enfant sur quatre exposé au risque de pauvreté ou d'exclusion sociale dans l'UE- Soit 25 millions d'enfants dans cette situation dans l'UE // Bruxelles, le 16 novembre 2016


17 October: International Day for the Eradication of Poverty-The share of persons at risk of poverty or social exclusion in the EU back to its pre-crisis level-Contrasting trends across Member States // Brussels, 17 October 2016

17 octobre: journée internationale pour l'élimination de la pauvreté-La proportion de personnes menacées de pauvreté ou d'exclusion sociale dans l'UE retrouve son niveau d'avant crise-Tendances divergentes entre États membres // Bruxelles, le 17 octobre 2016


The senior management and senior staff responsible for material business units, for management of specific risk categories such as liquidity, operational or interest rate risk, and for control functions within an institution are responsible for the day-to-day management of the business, its risks, or its control functions.

La direction générale et les membres de la direction chargés d'unités opérationnelles importantes, de la gestion de catégories de risque spécifiques, telles que le risque de liquidité, le risque opérationnel ou le risque de taux d'intérêt, ou de fonctions de contrôle au sein d'un établissement sont responsables de la gestion quotidienne de l'entreprise, de ses risques ou de ses fonctions de contrôle.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Since Directive 2013/36/EU does not specifically address intra-day credit and liquidity risks resulting from the provision of banking services ancillary to settlement, credit institutions and CSDs providing such services should also be subject to specific enhanced credit and liquidity risk mitigation requirements, including a risk-based capital surcharge which reflects the relevant risks.

La directive 2013/36/UE ne traitant pas spécifiquement des risques de crédit et de liquidité intrajournaliers liés à la prestation de services bancaires accessoires au règlement, les établissements de crédit et les DCT fournissant de tels services devraient aussi être soumis à des exigences renforcées et spécifiques d’atténuation des risques de crédit et de liquidité, y compris une surcharge en capital fondée sur les risques qui soit proportionnée aux risques pertinents.


a comparison of the daily end-of-day value-at-risk measures to the one-day changes of the portfolio’s value by the end of the subsequent business day together with an analysis of any important overshooting during the reporting period’.

une comparaison de la valeur en risque quotidienne en fin de journée avec les changements sur une journée de la valeur du portefeuille à la fin du jour ouvrable suivant, avec une analyse de tout dépassement important au cours de la période couverte».


The back‐testing has to provide for each business day a comparison of the one‐day value‐at‐risk measure generated by the institution's model for the portfolio's end‐of‐day positions to the one‐day change of the portfolio's value by the end of the subsequent business day.

Les contrôles a posteriori doivent fournir une comparaison, pour chaque jour ouvrable, entre la mesure de la valeur en risque («value-at-risk») sur un jour calculée par le modèle de l'établissement sur la base des positions du portefeuille en fin de journée et la variation sur un jour de la valeur du portefeuille constatée à la fin du jour ouvrable suivant.


To avoid double counting, an institution may, when calculating its incremental default risk charge, take into account the extent to which default risk has already been incorporated into the value‐at‐risk measure, especially for risk positions that could and would be closed within 10 days in the event of adverse market conditions or other indications of deterioration in the credit environment.

Afin d'éviter toute double comptabilisation, un établissement peut, en calculant l'exigence de fonds propres pour risque de défaut supplémentaire, tenir compte de la mesure dans laquelle le risque de défaut a déjà été intégré dans la mesure de la valeur en risque, en particulier en ce qui concerne les positions en risque qui pourraient être et seraient fermées dans un délai de dix jours si les conditions de marchés étaient défavorables ou si d'autres signes d'une détérioration de l'environnement de crédit apparaissaient.


The back‐testing has to provide for each business day a comparison of the one‐day value‐at‐risk measure generated by the institution's model for the portfolio's end‐of‐day positions to the one‐day change of the portfolio's value by the end of the subsequent business day.

Les contrôles a posteriori doivent fournir une comparaison, pour chaque jour ouvrable, entre la mesure de la valeur en risque («value-at-risk») sur un jour calculée par le modèle de l'établissement sur la base des positions du portefeuille en fin de journée et la variation sur un jour de la valeur du portefeuille constatée à la fin du jour ouvrable suivant.


To avoid double counting, an institution may, when calculating its incremental default risk charge, take into account the extent to which default risk has already been incorporated into the value‐at‐risk measure, especially for risk positions that could and would be closed within 10 days in the event of adverse market conditions or other indications of deterioration in the credit environment.

Afin d'éviter toute double comptabilisation, un établissement peut, en calculant l'exigence de fonds propres pour risque de défaut supplémentaire, tenir compte de la mesure dans laquelle le risque de défaut a déjà été intégré dans la mesure de la valeur en risque, en particulier en ce qui concerne les positions en risque qui pourraient être et seraient fermées dans un délai de dix jours si les conditions de marchés étaient défavorables ou si d'autres signes d'une détérioration de l'environnement de crédit apparaissaient.




datacenter (1): www.wordscope.be (v4.0.br)

'day risk' ->

Date index: 2021-01-28
w