Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assessing construction material samples
C22.2 NO. 33-M1984
Choose appropiate test of genetic testing
Choose type of genetic testing
Conduct patch testing
Conduct patch testings
Conduct patch-testing
Consider type of genetic testing
Construction and Test of Electric Cranes and Hoists
Construction and testing requirement
Construction material sample-testing
Decide on type of genetic testing
Highway construction materials testing technician
Inclined plane test
Lubricity test
Perform patch testing
Sliding test
Slipping test
Test bed
Test bench
Test construction
Test construction material samples
Test installation
Test plant
Test rig
Test stand
Test structure
Testing construction material samples

Vertaling van "construction and testing " (Engels → Frans) :

TERMINOLOGIE
construction and testing requirement

precription de construction et d'essai


highway construction materials testing technician

technicien en essais de matériaux de construction routière [ technicienne en essais de matériaux de construction routière ]


Construction and Test of Electric Storage-Tank Water Heaters [ CAN/CSA-C22.2 NO. 110-94 (R2014) ]

Construction et essai des chauffe-eau électriques à accumulation [ CAN/CSA-C22.2 NO. 110-F94 (C2014) ]


Construction and Test of Electric Cranes and Hoists [ C22.2 NO. 33-M1984 (R2014) ]

Ponts roulants et palans électriques [ C22.2 NO. 33-FM1984 (C2014) ]


construction material sample-testing | testing construction material samples | assessing construction material samples | test construction material samples

tester des échantillons de matériaux de construction




test bed | test bench | test installation | test plant | test rig | test stand

banc d'épreuve | banc d'essai


choose appropiate test of genetic testing | choose type of genetic testing | consider type of genetic testing | decide on type of genetic testing

décider du type de dépistage génétique


conduct patch-testing | perform patch testing | conduct patch testing | conduct patch testings

réaliser des tests épicutanés


inclined plane test | lubricity test | sliding test | slipping test

essai de glissement | essai du plan incliné
IN-CONTEXT TRANSLATIONS
(a) the manufacturer’s construction and testing facilities have, prior to the commencement of construction of the pressure vessel in accordance with these Regulations, been inspected by an inspector and the inspector has submitted a report thereon to the Board; and

a) les installations de construction et de mise à l’essai du fabricant ont été inspectées avant la construction, conformément au présent règlement, du récipient sous pression et l’inspecteur présente un rapport au Bureau;


(d) in the case of a pressure vessel, certificates of an approved classification society under the rules and codes of which the pressure, vessel was constructed, showing that the manufacturer’s construction and testing facilities were in compliance with those rules or codes, are submitted to the Board.

d) dans le cas d’un récipient sous pression, des certificats ou brevets de la société de classification agréée dont les règles ou codes ont été appliqués à la construction du récipient sont présentés au Bureau et indiquent que les installations de construction et de mise à l’essai du fabricant étaient conformes à ces règles ou codes.


137. Foothills shall appoint a qualified person to supervise the withdrawal and discharge of water for the construction or testing of the pipeline.

137. La Foothills doit nommer une personne compétente pour surveiller les prélèvements et les déversements d’eau dans le cadre de la construction ou des essais du pipe-line.


138. Where Foothills withdraws water for the construction or testing of the pipeline, it shall install screens satisfactory to the designated officer on all water intakes.

138. Lorsque la Foothills prélève de l’eau dans le cadre de la construction ou des essais du pipe-line, elle doit installer des grillages, satisfaisant le fonctionnaire désigné, à toutes les entrées d’eau.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Post-construction pressure testing allows final check for construction-related damage prior to operation.

L'épreuve sous pression après la construction permet de vérifier s'il y a des dommages liés aux travaux de construction avant de procéder à l'exploitation.


1. Each Member State shall grant EC component type-approval for any type of roll-over protection structure and its tractor attachment which satisfies the construction and testing requirements laid down in Annexes I and II.

1. Chaque État membre homologue tout type de dispositif de protection en cas de renversement ainsi que sa fixation sur le tracteur, conforme aux prescriptions de construction et d'essai prévues aux annexes I et II.


1. Each Member State shall grant EC component type-approval for any type of roll-over protection structure and its tractor attachment which satisfies the construction and testing requirements laid down in Annexes I and II.

1. Chaque État membre homologue tout type de dispositif de protection en cas de renversement ainsi que sa fixation sur le tracteur, conforme aux prescriptions de construction et d'essai prévues aux annexes I et II.


17. Recommends that the EU support international efforts to develop the highest possible safety standards, to be applied rigorously and developed in parallel with scientific progress and reflecting the legitimate concerns of citizens; highlights, in this context, the EU’s role in the Neighbourhood Policy as an instrument for cooperation on nuclear safety; urges the Member States and the Commission to take joint responsibility for strengthening international nuclear safety standards and their proper implementation, in close cooperation with the IAEA, the Espoo Convention secretariat and other relevant international organisations; invites the Commission to consider the IAEA post-Fukushima action plan and to submit an inclusive action plan ...[+++]

17. recommande que l'Union européenne soutienne les efforts déployés au niveau international pour mettre au point les normes de sûreté les plus élevées destinées à être appliquées strictement, évoluant en fonction des progrès scientifiques et répondant aux légitimes préoccupations des citoyens; souligne, à cet égard, le rôle que joue l'Union européenne dans le cadre de la politique de voisinage pour la coopération en matière de sûreté nucléaire; prie instamment les États membres et la Commission de prendre ensemble la responsabilité de renforcer les normes internationales en matière de sûreté nucléaire et de veiller à leur mise en œuvr ...[+++]


Transportable pressure equipment shall be understood as including gas cartridges (UN No. 2037) and excluding aerosols (UN No. 1950), open cryogenic receptacles, gas cylinders for breathing apparatus, fire extinguishers (UN No. 1044), transportable pressure equipment exempted according to 1.1.3.2 of the Annexes to Directive 2008/68/EC and transportable pressure equipment exempted from the rules for construction and testing of packaging according to special provisions in 3.3 of the Annexes to Directive 2008/68/EC.

Les équipements sous pression transportables comprennent les cartouches à gaz (n° ONU 2037) mais non les aérosols (n° ONU 1950), les récipients cryogéniques ouverts, les bouteilles de gaz pour les appareils respiratoires, les extincteurs d'incendie (n° ONU 1044), les équipements sous pression transportables exemptés au titre du point 1.1.3.2 des annexes de la directive 2008/68/CE et les équipements sous pression transportables non soumis aux règles relatives à la construction et à l'épreuve des emballages conformément aux dispositions particulières du point 3.3 des annexes de la directive 2008/68/CE.


(35) To avoid unnecessary testing of construction products, for which performance has already sufficiently been demonstrated by stable previous test results or other existing data, the manufacturer should be allowed, under conditions set up in the harmonised technical specifications or in a Commission Decision, to declare a certain level or class of performance without testing or without further testing.

(35) Afin d'éviter la réalisation d'essais inutiles sur des produits de construction dont la performance ressort déjà à suffisance des résultats stables d'essais antérieurs ou d'autres données existantes, le fabricant doit avoir la possibilité, dans les conditions prévues par les spécifications techniques harmonisées ou par une décision de la Commission, de déclarer un certain niveau ou une certaine classe de performance sans essai ...[+++]


w