Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
100-year flood
Detention basin
Develop flood remediation strategies
Flood control
Flood control reservoir
Flood control structure
Flood control works
Flood crest
Flood damage mitigation
Flood defence
Flood defence structure
Flood detention basin
Flood mitigation
Flood mitigation reservoir
Flood mitigation works
Flood peak
Flood protection
Flood protection structure
Flood protection works
Flood remediation strategies developing
Flood remediation strategies writing
Flood retention basin
Flood storage reservoir
Flood summit
Flood-mitigation reservoir
Flood-mitigation works
Flood-retarding basin
Maximum intensity of flood
Micellar emulsion flooding
Micellar flooding
Micellar polymer flooding
Micellar s
Micellar-polymer flooding
Micellar-surfactant flooding
Microemulsion flooding
Momentary flood peak
Occurrence of 100-year flood
One hundred year flood
One-in-a-hundred year flood
One-in-one hundred year flood
Peak flood
Retarding basin
Surfactant flood
Surfactant flooding
Writing flood remediation strategies

Traduction de «building flood » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
micellar flooding [ micellar emulsion flooding | microemulsion flooding | micellar-surfactant flooding | surfactant flooding | surfactant flood | micellar/polymer flooding | micellar-polymer flooding | micellar polymer flooding | micellar/polymer flood | surfactant/polymer flooding | micellar s ]

injection de microémulsion suivie de polymères [ injection micellaire | injection de polymères micellaires | injection de solutions micellaires ]


flood control structure | flood control works | flood defence | flood defence structure | flood protection works | flood-mitigation works

ouvrage de protection contre les crues


flood crest | flood peak | flood summit | maximum intensity of flood | momentary flood peak | peak flood

niveau maximum d'une crue | pointe de crue


flood control reservoir | flood detention basin | flood retention basin | flood-mitigation reservoir | flood-retarding basin | retarding basin

bassin de laminage | bassin de rétention des crues | réservoir de maîtrise des crues | réservoir d'écrêtement des crues


flood protection structure | flood control structure | flood defence structure | flood protection works | flood control works | flood mitigation works

ouvrage de protection contre les crues


flood control reservoir | flood mitigation reservoir | flood storage reservoir | flood-retarding basin | retarding basin | flood retention basin | flood detention basin | detention basin

bassin de rétention des crues | réservoir d'écrêtement des crues | réservoir de maîtrise des crues | bassin de laminage


flood remediation strategies developing | writing flood remediation strategies | develop flood remediation strategies | flood remediation strategies writing

élaborer des stratégies de prévention et de remédiation des inondations


one-in-one hundred year flood [ one-in-a-hundred year flood | one hundred year flood | 100-year flood | occurrence of 100-year flood ]

crue centenaire [ crue centennale | crue à récurrence de 100 ans | inondation de cent ans ]


flood protection | flood control | flood mitigation | flood damage mitigation | flood defence

protection contre les crues | défense contre les crues | lutte contre les crues


flood crest [ peak flood | momentary flood peak | maximum intensity of flood ]

pointe de crue [ crête de crue ]
TRADUCTIONS EN CONTEXTE
The kinds of action needed range from modifying building regulations to take account of future climate conditions, to building flood defences and developing drought-tolerant crops.

Les types d’actions nécessaires vont de la modification des réglementations relatives à la construction pour prendre en compte les futures conditions climatiques à la construction de systèmes de protection contre les inondations en passant par le développement de cultures résistantes à la sécheresse.


Floods and mass movements of soil cause erosion, pollution with sediments and loss of soil resources with major impacts for human activities and human lives, damage to buildings and infrastructures, and loss of agricultural land.

Les inondations et les mouvements du sol en masse causent une érosion, la pollution par les sédiments et la disparition des ressources du sol, avec des effets importants pour les activités humaines et les vies humaines, des dommages aux bâtiments et aux infrastructures, et la diminution des terres agricoles.


However, despite recent progress, pan-European datasets needed to build GMES services addressing cross border issues, such as floods, remain underdeveloped.

Cependant, malgré les progrès récents, les ensembles de données paneuropéens nécessaires à la mise en place de services GMES pour résoudre des problèmes transfrontaliers, comme les inondations, demeurent sous-développés.


The flooding affected essential infrastructure, especially for transport, as well as public buildings, private homes, businesses and farmland in several regions of England, Northern Ireland, Scotland and Wales.

Ces inondations ont endommagé des infrastructures essentielles, particulièrement en ce qui concerne les transports, ainsi que des bâtiments publics, des habitations privées, des entreprises et des terres agricoles dans plusieurs régions de l'Angleterre, de l'Irlande du Nord, de l'Écosse et du pays de Galles.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Commissioner, local people are asking questions such as: can the EU give grants which might be matched by national funding to prevent further flooding by building flood defences? Secondly, should the EU review its directive which prevents the spoil from dredging rivers and streams being left on the banks of these rivers?

Monsieur le Commissaire, les personnes au niveau local se posent des questions telles que «L’UE peut-elle accorder des subventions qui s’accorderaient avec un financement national afin d’empêcher d’autres inondations en construisant des ouvrages de protection contre les crues ?» Deuxièmement, «L’UE devrait-elle revoir sa directive qui empêche les déblais issus du dragage des cours d’eau et des ruisseaux de rester sur les bords de ces cours d’eau ?» Lorsque nous examinons les prévisions pour le futur, il est incontestable que ces conditions vont probablement s’empirer.


It is true that establishing and demarcating risk areas could have significant economic consequences at regional level, given the value of building land in areas under pressure from urban expansion, but the identification of flood-prone areas is fully justified when making land available for building would lead to reduced water-absorption capacity and consequently an increased flooding risk.

Bien que la délimitation de zones de risque puisse avoir des conséquences économiques significatives au niveau régional, compte tenu de la valeur des terrains de construction dans les zones confrontées à une pression urbanistique, cette démarche apparaît justifiée lorsque l'extension d'une zone constructible – qui s'accompagne de l'imperméabilisation des sols – est de nature à accroître les risques d'inondations.


We then mobilised over EUR 140 million under the Interreg programme, and that money made it possible to develop flood-monitoring and warning systems, and identify risk areas, build flood control reservoirs and facilitate water run-off.

Nous avons alors mobilisé plus de 140 millions d'euros dans le cadre d'Interreg, et cet argent a permis de développer des systèmes de surveillance des crues et d'alerte, ainsi que d'identifier des zones à risques, d'aménager des bassins de rétention, de faciliter l'écoulement des eaux.


We then mobilised over EUR 140 million under the Interreg programme, and that money made it possible to develop flood-monitoring and warning systems, and identify risk areas, build flood control reservoirs and facilitate water run-off.

Nous avons alors mobilisé plus de 140 millions d'euros dans le cadre d'Interreg, et cet argent a permis de développer des systèmes de surveillance des crues et d'alerte, ainsi que d'identifier des zones à risques, d'aménager des bassins de rétention, de faciliter l'écoulement des eaux.


It should also include the ability of the building to resist environmental risks, such as flooding, storms or earthquakes, depending on their location.

Elle devrait également englober la capacité des bâtiments à résister aux risques environnementaux, tels que les inondations, les tempêtes ou les tremblements de terre, selon leur implantation.


Anyone who has seen the effects of flood damage, as we have in many regions throughout the European Union, will know how devastating it can be, not only to infrastructure but to life and indeed to roads and buildings, as the previous speaker mentioned.

Tous ceux qui ont vu les dégâts causés par les inondations qui ont touché plusieurs régions de l'Union européenne savent à quel point elles peuvent être dévastatrices. Elles peuvent détruire des infrastructures mais également des vies, des routes et des immeubles, comme l'a mentionné l'intervenant précédent.




datacenter (1): www.wordscope.be (v4.0.br)

'building flood' ->

Date index: 2022-08-07
w