Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Development phase
Installation and checkout phase
Instalment
Phase of implementation
SPII
Sirene Phase II
Step for extension
Systems Installation Phase

Traduction de «Installation and checkout phase » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
installation and checkout phase

phase d'installation et de mise au point


Financial Regulation on the installation and operation of Phase II of the Sirene network | Sirene Phase II | SPII [Abbr.]

règlement financier relatif à l'installation et au fonctionnement du réseau SIRENE phase II | SIRENE phase II | SPII [Abbr.]


phase of implementation (1) | development phase (2) | instalment (3) | step for extension (4)

étape de réalisation [ ERE ]


Systems Installation Phase

phase d'installation des systèmes
TRADUCTIONS EN CONTEXTE
Specific exceptions are included for installations of a certain size, for which it cannot be presumed that a bidding process is appropriate, or for installations at demonstration phase.

Des exceptions spécifiques sont prévues pour les installations d’une certaine taille pour lesquelles on ne peut supposer qu’une procédure de mise en concurrence est appropriée ou pour les installations qui se trouvent en phase de démonstration.


more detailed provisions for different life-cycle phases of nuclear installations, including methodological requirements concerning the siting, design, construction, commissioning, operation and decommissioning of nuclear installations.

- introduction d'objectifs généraux de sûreté applicables aux installations nucléaires fixant des dispositions plus détaillées pour les différentes phases du cycle de vie des installations nucléaires, dont des exigences méthodologiques concernant le choix des sites, la conception, la construction, la mise en service, l'exploitation et le déclassement des installations nucléaires;


In addition, the general public should be given opportunities to participate in the relevant phases of the decision-making process related to nuclear installations in accordance with the national framework for nuclear safety, taking into account the different national systems.

En outre, il convient que la population ait la possibilité de participer aux phases pertinentes du processus décisionnel concernant les installations nucléaires, conformément au cadre national pour la sûreté nucléaire et en tenant compte des différents systèmes nationaux.


Mercury emissions in the different phases of the life cycle of the lamps, including from electricity generation in the use phase and from the 80 % of directional compact fluorescent lamps containing mercury which are presumed not to be recycled at the end of their life, have been estimated to be 0,7 tonnes in 2007 from the installed stock of lamps.

Les émissions de mercure au cours des différentes phases du cycle de vie des lampes, y compris celles provenant de la production d’électricité pendant la phase d’utilisation et des 80 % de lampes fluocompactes dirigées contenant du mercure qui ne seront vraisemblablement pas recyclées à la fin de leur cycle de vie, ont été estimées à 0,7 tonne en 2007 pour le parc de lampes installé.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
3. The deployment phase (2014 - 2020): The deployment phase will see the large-scale installation of the new systems and the implementation of the related functions. In the deployment phase the industry will be fully responsible for the financing.

Cette phase correspondra à l'installation à grande échelle des nouveaux systèmes et à la mise en œuvre généralisée des fonctionnalités qui y sont associées. Au cours de la phase de déploiement, le financement sera entièrement à la charge de l'industrie.


In amendments 7 and 10 the deadlines were brought into line with those in amendment 6, which was accepted, so as to achieve a phased-in implementation of the directive over 2, 3, 4 and 5 years, i.e. implementation by the Member States and installation of speed limitation devices in new vehicles within two years of the entry into force of the directive, retro-fitting of speed limitation devices into vehicles which are used in international transport within three years, retro-fitting of speed limitation devices into vehicles which are e ...[+++]

En ce qui concerne les amendements 7 et 10, les dates ont été alignées sur celles de l'amendement 6, qui a été accepté, de manière à ce que l'on obtienne un système de mise en œuvre progressive de la directive, dans des délais de 2‑3‑4‑5 ans: les États membres devront installer des limiteurs de vitesse sur les véhicules neufs deux ans après l'entrée en vigueur de la directive, l'installation rétroactive de limiteurs de vitesse sur les véhicules utilisés pour les opérations de transport international devra intervenir trois ans après l' ...[+++]


Article 1(4) of the proposal sets out a phased-in installation of speed limitation devices in the above vehicles, with a timetable beginning in 2004 for new vehicles and ending in 2006 for vehicles which are used exclusively for national transport operations.

À l'article 1, paragraphe 4, de la proposition est prévue l'installation progressive de limiteurs de vitesse sur les véhicules précités, selon un calendrier qui va de 2004, pour les véhicules neufs, à 2006, pour les véhicules utilisés uniquement pour les transports nationaux.


As a result of the Directive the mandatory installation and use of speed limitation devices throughout the EU was introduced in three phases:

À la suite de l'adoption de la directive, l'installation et l'utilisation obligatoires de limiteurs de vitesse dans toute l'Union se sont effectuées en trois phases:


(11) The development phase should be followed by the deployment phase consisting of the production of satellites and terrestrial components, satellite launching and the installation of terrestrial stations and equipment in order to enable the system to be operational in 2008.

(11) La phase de développement devrait être suivie par la phase de déploiement, qui consiste à fabriquer des satellites et des composantes terrestres, à lancer des satellites et à installer des stations et des équipements terrestres afin que le système puisse être opérationnel en 2008.


(b) a red pilot light which comes on when the installation breaks down or is accidentally disconnected, when the electric motor is overloaded or when one phase of a three-phase supply fails.

b) un voyant lumineux rouge qui s'allume lorsque l'installation tombe en panne, qu'elle est débranchée accidentellement, en cas de surcharge du moteur électrique ou de défaillance d'une phase d'alimentation dans les installations à courant triphasé.




datacenter (1): www.wordscope.be (v4.0.br)

'Installation and checkout phase' ->

Date index: 2024-08-13
w