Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Assess functionality of ground systems
Develop tests for ground system performance
Develop tests for performance of ground systems
Test ground system performance

Traduction de «Ground Systems Development Section » (Anglais → Français) :

TERMINOLOGIE
voir aussi les traductions en contexte ci-dessous
develop tests for ground system performance | develop tests for performance of ground systems | assess functionality of ground systems | test ground system performance

tester les performances du système au sol
TRADUCTIONS EN CONTEXTE
Chapter 2 ‘Aeronautical Mobile Service’, Section 2.1 ‘Air-ground VHF communication system characteristics’, Section 2.3.1 ‘Transmitting function’ and Section 2.3.2 ‘Receiving function’ excluding Subsection 2.3.2.8 ‘VDL — Interference Immunity Performance’ of Annex 10 to the Chicago Convention, Volume III, Part 2 (Second Edition — July 2007 incorporating Amendment No 85).

Chapitre 2 «Service mobile aéronautique», section 2.1 «Caractéristiques des systèmes de communication VHF air-sol», section 2.3.1 «Fonction émission» et section 2.3.2 «Fonction réception», à l’exclusion de la sous-section 2.3.2.8 «VDL — Performances d’immunité à l’égard du brouillage» de l’annexe 10 de la convention de Chicago, volume III, 2e partie (deuxième édition — juillet 2007, intégrant l’amendement 85).


Chapter 2 ‘Aeronautical Mobile Service, Section 2.1 ‘Air-ground VHF communication system characteristics’ and Section 2.2 ‘System characteristics of the ground installations’ of Annex 10 to the Chicago Convention, Volume III, Part 2 (Second Edition — July 2007 incorporating Amendment No 85).

Chapitre 2 «Service mobile aéronautique», section 2.1 «Caractéristiques des systèmes de communication VHF air-sol» et section 2.2 «Caractéristiques de système de l’installation au sol» de l’annexe 10 de la convention de Chicago, volume III, 2e partie (deuxième édition — juillet 2007, intégrant l’amendement 85).


Chapter 5, ‘SSR Mode S Air-Ground Data Link, Section 5.2.9 ‘The data link capability report format’ of ICAO Annex 10 ‘Aeronautical Telecommunications’, Volume III ‘Communication Systems’ (First Edition, Amendment 79).

Chapitre 5 — Liaison de données air-sol du SSR mode S, section 5.2.9 «Format de compte rendu de capacité de liaison de données» du volume III — Systèmes de télécommunication — de l'annexe 10 — Télécommunications aéronautiques – de l'OACI (première édition, amendement 79).


Chapter 2 ‘Aeronautical Mobile Service’, Section 2.1 ‘Air-ground VHF communication system characteristics’, Section 2.3.1 ‘Transmitting function’ and Section 2.3.2 ‘Receiving function’ excluding sub-section 2.3.2.8 ‘VDL — Interference Immunity Performance’ of ICAO Annex 10, Volume III, Part 2 (First Edition — July 1995 incorporating Amendment No 80).

Chapitre 2 «Aeronautical Mobile Service», section 2.1 «Air-ground VHF communication system characteristics», section 2.3.1 «Transmitting function» et section 2.3.2 «Receiving function», à l’exclusion de la sous-section 2.3.2.8 «VDL — Interference Immunity Performance» de l’annexe 10 de l’OACI, volume III, deuxième partie (première édition — juillet 1995, intégrant l’amendement 80).


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
[22] The total amount involved is higher than the rough figures initially put forward in the financial statement annexed to the Belgian-Swedish initiatives proposing a committee procedure to assist the Commission in its work, but is grounded on a thorough analysis of the usual needs for IT projects of this scale and sensitiveness, especially in terms of management of the project and system development.

Son montant total est supérieur au montant global indiqué initialement dans la fiche financière annexée aux initiatives belgo-suédoises proposant une comitologie pour assister la Commission dans ses travaux, mais il est fondé sur une analyse approfondie des besoins habituels pour les projets informatiques de ces échelle et sensibilité, notamment en termes de gestion du projet et de développement du système.




datacenter (1): www.wordscope.be (v4.0.br)

'Ground Systems Development Section' ->

Date index: 2021-11-26
w