Boost Your Productivity!Translate documents (Ms-Word, Ms-Excel, ...) faster and better thanks to artificial intelligence!
https://pro.wordscope.com
https://blog. wordscope .com
Advice taking
Capacity all told
Learning by being told
Learning from instruction
Total dead weight carrying capacity
Total dead-weight carrying capacity
Total deadweight carrying capacity
Weight all told

Vertaling van "all you've told " (Engels → Frans) :

TERMINOLOGIE
advice taking | learning by being told | learning from instruction

apprentissage par instruction




total dead weight carrying capacity | total deadweight carrying capacity | total dead-weight carrying capacity | weight all told

port en lourd total | portée en lourd totale
IN-CONTEXT TRANSLATIONS
The plaintiff also confirmed that he had been given the relevant address of the applicant authority in Greece and that he had been told by the requested authority in Ireland that it would not take any further action while he raised the matter with the applicant authority.

Le demandeur a également confirmé que l’adresse exacte de l’autorité requérante en Grèce lui a été fournie et que l’autorité requise en Irlande lui a indiqué qu’elle ne prendrait aucune autre mesure tant que l’affaire serait portée devant l’autorité requérante.


A similar story can be told with the waste plans [12], where legal measures started against almost all Member States in 1997 for lack of waste plans.

Il en va de même avec les plans d'élimination des déchets [12]. En 1997, une action en justice a été intentée à l'encontre de la quasi-totalité des États membres au motif de défaut de plan d'élimination des déchets.


In practice, when a company tries to register with ECHA, they are told that they should contact the lead registrant, who will then inform them of the cost of authorising access to the information deposited. This can reach up to tens or hundreds of thousands of Euros per substance.

Dans la pratique, lorsqu’une entreprise tente d’effectuer un enregistrement auprès de l’ECHA, il lui est signifié qu’elle devrait prendre contact avec le déclarant principal, lequel l’informe ensuite du coût de l’autorisation d’accès à l’information qu’il a déposée, ce coût pouvant atteindre des dizaines, voire des centaines de milliers d’euros par substance.


With regards to his expectations ahead of tonight's Euro Summit, President Juncker said “We will sit down tonight and will try to get things going without rhetorical side-effects so that we can get to an agreeable solution (.) The Commission would like to know what the “no” vote means, because I am told it's not a "no" to Europe, and I am told it's not a “no” to the euro.

À propos du sommet européen de ce soir, le président Juncker a déclaré: «Nous nous rencontrerons donc à nouveau ce soir et nous nous efforcerons de mettre en route ces négociations, sans rhétorique inutile, d'une manière telle que nous puissions trouver un consensus. [.] La Commission européenne, pour sa part, souhaiterait savoir ce que ce vote signifie.


For more results, go to https://pro.wordscope.com to translate your documents with Wordscope Pro!
Also according to the GOE's report, former ADF fighters told the GOE that the ADF's training groups typically include adult men and boys and two boys who escaped from the ADF in 2013 told the GOE that they had received military training from the ADF.

Toujours selon le même rapport, d'anciens combattants des ADF ont déclaré au Groupe d'experts que les cellules de formation de ces forces comprennent généralement des hommes adultes et des garçons. En outre, deux garçons qui s'étaient échappés des ADF en 2013 ont dit au Groupe d'experts qu'ils avaient reçu de ces forces un entraînement militaire.


On 7 August 2014, the European Commission received a notification of a proposed concentration pursuant to Article 4 of Council Regulation (EC) No 139/2004 (1) by which the undertaking Ferrero International S.A (‘Ferrero International’, Luxembourg) acquires within the meaning of Article 3(1)(b) of the Merger Regulation sole control of the whole of the undertaking Oltan Gida Maddeleri İhracat İthalat ve Ticaret Anonim Şirketi, the undertaking Oltan Fındık İşletmeleri Sanayi Ve Ticaret Anonim Şirketi, the undertaking Oltan Fındık Sanayi ve Ticaret Anonim Şirketi, the undertaking Oltan Boyer SAS and the undertaking Oltan Grout Limited (toget ...[+++]

Le 7 août 2014, la Commission européenne a reçu notification, conformément à l’article 4 du règlement (CE) no 139/2004 du Conseil (1), d’un projet de concentration par lequel l’entreprise Ferrero International SA («Ferrero International», Luxembourg) acquiert, au sens de l’article 3, paragraphe 1, point b), du règlement sur les concentrations, le contrôle exclusif de l’ensemble de l’entreprise Oltan Gida Maddeleri İhracat İthalat ve Ticaret Anonim Şirketi, de l’entreprise Oltan Fındık İşletmeleri Sanayi Ve Ticaret Anonim Şirketi, de l’entreprise Oltan Fındık Sanayi ve Ticaret Anonim Şirketi, de l’entreprise Oltan Boyer SAS et de l’entrep ...[+++]


1 By their appeal the companies Diy-Mar Insaat Sanayi ve Ticaret Ltd Sirketi and Musa Akar ask the Court to set aside the order of the Court of First Instance of the European Communities of 17 January 2007 in Case T‑129/06 Diy-Mar Insaat Sanayi ve Ticaret and Akar v Commission, not published in ECR, (‘the order under appeal’) dismissing as inadmissible their action which sought, first, annulment of the decision of the Commission MK/KS/DELTUR/(2005)/SecE/D/1614 of 23 December 2005 relating to the award of public works contracts for the construction of educational facilities in the provinces of Siirt and Diyarbakir (‘the contested decision’), and, secondly, suspension of the operation of the award procedure in question.

Par leur pourvoi, les sociétés Diy-Mar Insaat Sanayi ve Ticaret Ltd Sirketi et Musa Akar demandent l’annulation de l’ordonnance du Tribunal de première instance des Communautés européennes du 17 janvier 2007, Diy-Mar Insaat Sanayi ve Ticaret et Akar/Commission (T‑129/06, non publiée au Recueil, ci-après l’«ordonnance attaquée»), par laquelle celui-ci a rejeté comme irrecevable leur recours tendant, d’une part, à l’annulation de la décision MK/KS/DELTUR/(2005)/SecE/D/1614 de la Commission, du 23 décembre 2005, relative à la passation du marché public de travaux relatif à la construction d’établissements d’enseignement dans les provinces de Siirt et de Diyarbakir (ci-après la «décision litigieuse»), et, d’autre part, au sursis à l’exécution d ...[+++]


These are: 1. Record of proper waste management forms and collective record of proper waste management forms: - Cover sheet for records of proper waste management (EN), - Responsible declaration (VE), - Declaration analysis (DA), - Declaration of acceptance (AE), - Official confirmation (BB), 2. Notification report forms: - Cover sheet for notification/application (AA), - Responsible declaration (VE) - (without declaration analysis (DA)), 3. Exemption forms: - Cover sheet for notification/application (AA), - Declaration of acceptance (AE), - Official confirmation (BB), 4.

Il s'agit des documents suivants : 1. un recueil de formulaires de gestion adéquate des déchets comportant : une page de garde pour les propres enregistrements de gestion des déchets (EN), une déclaration de responsabilité (VE), une analyse de la déclaration (DA), une déclaration d'acceptation (AE) et une confirmation officielle (BB) ; 2. des formulaires de rapport de notification comportant : une page de garde pour la notification/demande (AA) et une déclaration de responsabilité (VE) (sans analyse de la déclaration (DA)) ; 3. des formulaires de dérogation comportant : une page de garde pour la notification/demande (AA), une déclaration d'acceptation (AE) et une confirmation officielle (BB) ; 4. un recueil de formulaires de gestion adéq ...[+++]


A similar story can be told with the waste plans [12], where legal measures started against almost all Member States in 1997 for lack of waste plans.

Il en va de même avec les plans d'élimination des déchets [12]. En 1997, une action en justice a été intentée à l'encontre de la quasi-totalité des États membres au motif de défaut de plan d'élimination des déchets.


Nevertheless, in order to comply with the rules governing the period 2000-06, Mr Barnier (the Member of the Commission responsible for regional policy), in agreement with Ms Walström (the Member of the Commission responsible for the environment), reminded the Member States of their obligations in this respect and told them that the programming documents for the new period had to include clear and irrevocable commitments to ensure that this programming included the protection of sites which forms part of Natura 2000.

Nonobstant ceci, et afin de respecter la réglementation applicable pour la période nouvelle 2000-2006, M. Barnier (membre de la Commission chargé de la politique régionale), après concertation avec Mme Walström (membre de la Commission chargé de l'environnement), s'est adressé aux États membres pour leur rappeler leurs obligations en la matière, et leur indiquer que les documents de programmation pour la nouvelle période devraient impérativement comporter des engagements clairs et irrévocables afin de garantir la cohérence de ces prog ...[+++]




datacenter (1): www.wordscope.be (v4.0.br)

all you've told ->

Date index: 2024-06-26
w